The TAMS Grant for Farm Sheds

TAMS 3 pays 40% of the eligible cost of a farm building, or 60% for qualifying young farmers, women farmers and organic farmers, on up to €90,000 of spending a holding. Slurry and manure storage has its own ceiling of €90,000 at 60%, so a slatted shed can draw on both. A registered farm partnership has a ceiling of €160,000. The grant is paid on the Department's reference cost or your receipts, whichever is lower, and work must not start before written approval.

The rates, the ceilings, the catch in the reference costs, and the steps.

Free, no obligation. One local company prices it, not five.

  • 40% or 60%of the eligible cost
  • €90,000spending ceiling a holding
  • 60%on slurry storage, separate ceiling
  • €160,000ceiling for a registered partnership

The rates and ceilings

Who or whatRateCeiling
Animal housing, most farmers40%€90,000 of spending
Young farmers, women farmers, organic farmers60%€90,000
Slurry and manure storage: tanks, manure pits, circular and lined stores60%A separate €90,000
Farm safety works, including replacing slats60%€90,000
Storage for imported slurry and manure70%A separate €90,000
Registered farm partnerships40% or 60%€160,000

The two ceilings stack. A farmer building a slatted shed can spend up to €90,000 on the tank at 60% and a further €90,000 on the shed above it at 40% or 60%.

Reference costs: the catch

The grant is worked out on the Department's reference cost or your receipts, whichever is lower. Real quotes usually come in above the reference cost, and the gap is yours to pay in full.

BuildingReference cost
Slatted cattle area, roofed€278 per m²
Slatted and cubicle area over a tank€292 per m²
Loose house for cattle€201 per m²
Calving pen area€320 per m²
Calf house with penning€272 per m²
Slatted house for sheep€252 per m²
Grain store€299 per m²
Silage slab€47 per m²
Manure pit with walls€83 per m²

These are the costs for applications since September 2025, before VAT. On a four-bay slatted suckler shed they add up to about €107,700. On recent builds, real costs have run from 10% to more than 30% above the reference cost.

The steps

  1. Planning. Full permission, or a Section 5 declaration that the shed is exempt. The application needs one or the other.
  2. Drawings and a spec. To the Department's building specifications.
  3. Apply online in an open tranche. Applications are ranked, so approval is not automatic.
  4. Wait for written approval. Six to twelve months is normal. Start before it and there is no grant.
  5. Build. A tax-compliant contractor, to the specification.
  6. Claim. Paid invoices, certificates, tax clearance and geotagged photos of each finished part.

What isn't covered

  • VAT. Reference costs are before VAT and the grant is never paid on it.
  • Anything started before approval.
  • Plain hay and machinery sheds.
  • Work in a shed with agitation points inside it, until external ones are made.
  • The part of any bill above the reference cost.

Roofs

Since December 2025 the scheme also takes applications for replacing the roof of an existing farm building, under its farm safety measure. See shed roofs.

Every guide, calculator and county page

Jump straight to any specification guide, our interactive calculator, the technical glossary or your county page.

Price your shed

Four taps: what the shed is for, how many bays, new or extension, grant or no grant. You see the likely shed and our price for it. Your number is only asked for at the end, if you want one farm shed builder that covers your county to ring you.

What is the shed for?

Pick the nearest. They'll ask the rest.

Privacy notice

Questions people ask

How much is the TAMS grant for a shed?

40%, or 60% for young farmers, women farmers and organic farmers, on up to €90,000 of spending. The most a single farmer gets on that ceiling is €36,000 or €54,000.

Can I get 60% on a slurry tank?

Yes. Tanks, manure pits and slurry stores get 60% for every applicant, from a separate €90,000 ceiling.

Can I start building before approval?

No. Work started before written approval gets no grant.

How long does approval take?

Six to twelve months. Apply the winter before you need the shed.

Is the grant paid on what I spend?

On the reference cost or your receipts, whichever is lower.

Get a price for your farm shed

One farm shed builder that covers your county. Free, no obligation. Nothing is booked until you say yes.